| dc.contributor.author | Ayeh-Paye, Samuel | |
| dc.date.accessioned | 2023-12-12T09:49:19Z | |
| dc.date.available | 2023-12-12T09:49:19Z | |
| dc.date.issued | 2020-08 | |
| dc.identifier.uri | ir.parliament.gh/handle/123456789/3840 | |
| dc.language.iso | en | en_US |
| dc.publisher | Parliament of Ghana | en_US |
| dc.subject | The Black Volta River at Dikpa | en_US |
| dc.subject | Three Bridges over River Sweet, Ankobra and Black Volta | en_US |
| dc.subject | Griner Engineering GH Limited | en_US |
| dc.title | Report of the Committee on Roads and Transport on the design–build contract agreement between the Government of the Republic of Ghana (Represented by the Ministry of Roads and Highways) [Ghana Highway Authority ] and Griner Engineering GH Limited for an amount of Fifty-Eight Million, One Thousand, One Hundred and Thirty –Eight Euros and Eight Cent (€58,001,138.80) for the design and constriction of three bridges over Sweet River at Iture, River Ankobraat Ankobra and Black Volta at Dikpe | en_US |
| dc.type | Working Paper | en_US |