dc.contributor.author |
Ayeh-Paye, Samuel |
|
dc.date.accessioned |
2023-12-12T09:49:19Z |
|
dc.date.available |
2023-12-12T09:49:19Z |
|
dc.date.issued |
2020-08 |
|
dc.identifier.uri |
ir.parliament.gh/handle/123456789/3840 |
|
dc.language.iso |
en |
en_US |
dc.publisher |
Parliament of Ghana |
en_US |
dc.subject |
The Black Volta River at Dikpa |
en_US |
dc.subject |
Three Bridges over River Sweet, Ankobra and Black Volta |
en_US |
dc.subject |
Griner Engineering GH Limited |
en_US |
dc.title |
Report of the Committee on Roads and Transport on the design–build contract agreement between the Government of the Republic of Ghana (Represented by the Ministry of Roads and Highways) [Ghana Highway Authority ] and Griner Engineering GH Limited for an amount of Fifty-Eight Million, One Thousand, One Hundred and Thirty –Eight Euros and Eight Cent (€58,001,138.80) for the design and constriction of three bridges over Sweet River at Iture, River Ankobraat Ankobra and Black Volta at Dikpe |
en_US |
dc.type |
Working Paper |
en_US |